Quality auditing for NZ engineering and infrastructure
Internal, second party, independent and contract auditing that tells you whether the system is actually working.
Stub copy. Replace before launch. See deliverable 3 in the build brief.
What you end up with
- Stub outcome one. Replace with a named outcome.
- Stub outcome two. Replace with a named outcome.
- Stub outcome three. Replace with a named outcome.
Deliverables
| Deliverable | What it is | What it is not | Owner |
|---|---|---|---|
| Stub deliverable | Replace with what the deliverable is. | Replace with what the deliverable is not. | Touchstone to draft |
Anything not listed above is treated as a variation.
Standards: ISO 9001, ISO 19011, NZS 3910